10.3   LP feed system

 

It is expected that future large coal-fired units will use an LP feed system similar to that already illustrated in Fig 3.6 for the PWR cycle (i.e., forward pumping of higher pressure LP heater drains with the lower pressure heaters mounted in the condenser neck). There will therefore be no significant changes in existing system design or components.

 

<<- Previous entry                  Table of contents             Next entry ->>